Skip Navigation

Run an end-to-end test

  1. Check System Jobs to verify that both the CAP Feed Poller and the CAP Event Processor jobs are running.
  2. Ensure that an alert template (scenario) is available in 
    BlackBerry AtHoc
    . The common name should match the alert template common name specified in the configuration. The value in the configuration file maps to Honeywell feeds.
    Create the alert template if it has not been created.
  3. Trigger an event from Honeywell.
  4. Check the event status in the 
    EVT_QUEUE_TAB
     table in the 
    ngaddata
     database.
  5. Check the 
    Alert Manager
     in 
    BlackBerry AtHoc
     for a new alert from Honeywell. The test is successful when you receive the alert from the Honeywell system.